top of page
Advocate-A-white-transparent.png

A CAMPUS IN TRANSFORMATION

Lee Delay
1 day ago
3 min read

From Visual Arts buildings and science labs to student spaces and campus security, MHCC’s voter-approved $136 million bond is funding renovations across the Gresham campus.


Mt. Hood Community College is getting a makeover. From classroom rooftops to an upgraded Aquatics Center, a campus-wide transformation is underway.


The college received approval for a $136 million bond in 2025 to help upgrade the facilities. Since then, the college has used those funds to start numerous repairs and upgrades across the Gresham campus, including repaving the parking lots and implementing a new mass notification system.


There are more improvements underway with more to come in the following year. These improvements will happen in stages.


$136M

Bond approved in 2025

21

Years of projected bond payments

$60

Approximate annual cost to the average homeowner in the district.


The Visual Arts department buildings are currently being renovated, replacing the roofing and siding to help ensure the buildings stay usable for years into the future. Visual Arts Building 11 has already been completed and buildings VA-8, VA-13, VA-15 and VA-17 are being worked on in stages and expected to be completed by the end of fall term.


The Aquatics Center is also undergoing major renovations. The installation of a new retractable dome over the pool is a project that started with a grant in 2020 and is being finished using funds from the bond. This past October, panels and sections for the structure were assembled, with additional infrastructure work scheduled. The 50-foot pool will remain closed while construction is underway, although the project is slightly behind schedule with completion currently expected in January or February.


Looking forward to winter, the focus is on needed security upgrades for the Gresham campus. A new electronic lockdown system will be installed that allows remote locking of buildings during emergencies. The video surveillance system will also be replaced.


The science labs are slated for a complete renovation during spring term including needed safety upgrades such as ventilation in chemical storage areas.


Over the summer, the health professionals department will also see new labs for nursing, EMT and multidisciplinary students, alongside upgrades to existing facilities as part of a plan to consolidate programs and better serve student needs.


Large-scale renovations are planned over the summer for campus life facilities.

Renovations include the student lounge and restrooms, the Student Union to include new spaces for student clubs and upgrades to the Vista dining hall. Campus food delivery concepts will also be updated.


Additional improvements will include renovations to campus paths and roadways, as well as repairs to concrete walls near Building 12.


The bond costs the average homeowner throughout Mt. Hood Community College District, which spans over 950 square miles and includes parts of Multnomah, Clackamas and Hood River counties, approximately $60 per year and is slated to last 21 years. It is already funding visible changes across campus. The bond oversight committee, which includes Gresham Councilor-elect Heather Coleman-Cox, provides regular updates on the progress of construction and monitors how the funds are being spent.


The next bond oversight committee meeting is scheduled for Feb. 4, 2027, but students, faculty and staff will have an opportunity to get involved sooner.


A design team meeting on Dec. 2, 2026, will invite campus community members to review current plans and share their perspectives on proposed improvements.


The meeting will be divided into two sessions. The first, at 2 p.m., will focus on health and science facilities, including the science department, early health occupations and plans for buildings 15, 16 and 17.


The second session, at 3:30 p.m., will cover the Academic Center, student spaces, accessibility, campus security, wayfinding, seismic upgrades and building systems.


HAVE YOUR SAY ON CAMPUS IMPROVEMENTS

DEC. 2, 2026 — DESIGN TEAM MEETING

2 P.M. — Health and science facilities, early health occupations and buildings 15, 16 and 17.

3:30 P.M. — Academic Center, student spaces, accessibility, security, wayfinding, seismic upgrades and building systems.


Comments


bottom of page